Updating report content

In reality, software design keeps evolving from time to time. Originally, users needed to modify the related documents manually to ensure that it is fully conformed to the latest design. Report Writer binds closely with the VP-UML project, and hence generated elements can then be updated without affecting the user-defined content.

Report writer
Report writer

Edit project's content which used by report.

Edit project
Edit project

To update a report, choose the desired report for updating from the drop-down menu and click the Update from Model button from the toolbar or select Report > Update from Model from main menu.

Update from model element
Update from model element

Update process will start automatically. Data will be extracted from project and replace with the content within the existing generated element.

Updated report
Updated report
NOTE: Please do not click on the Writer Pane while the update process is undergoing, as it may affect the accuracy of the content. It can also damage the generated element, so that updating cannot be performed anymore unless the damaged block is removed manually.
NOTE: The update process will replace ALL the contents within each generated element without notification. Therefore please insert the content carefully and ensure that it is not located inside the scope of any generated elements.